Trades and construction
Job folder and site weather check ready before the crew leaves.
Before every appointment someone gathers the quote, measurements, plans, and the customer's last email. On site, a page is still missing, the old plan revision is in the folder, or heavy wind and rain unexpectedly halt exterior roof and window work.
Today in your business
Where time is lost between office and site
Of each plan the latest version counts. What is missing appears as "missing" in the folder.
3 interactive workflows MITDesk prepares
Pick a real business situation, start the demo, test missing details or rejection, and inspect the verifiable output.
When something is missing or does not match
Document missing. First page: "Measurements missing - clarify before leaving."
System integration & setup
How MITDesk connects office, scheduling, and construction site
Craft and construction businesses connect their project and drawing folder, office mailbox, dispatch calendar, and optionally their job and timesheet records in Odoo.
1. Mailbox, calendar & file folders
Start without rebuilding your IT: the AI employee reads a permitted mailbox, an availability calendar, and your shared document folders (e.g. Microsoft 365, Google Workspace, Nextcloud, or IMAP).
2. Direct connection to supported applications
Where a supported connector is available (e.g. Odoo, Zammad, GitLab, Qonto, Lexware Office, sevDesk), the AI employee works through its own strictly scoped user account.
3. Alongside existing sector software
If your sector or practice software does not expose an open write API, MITDesk works cleanly alongside it via incoming emails, file exports, or the side panel - and your team applies the verified result.
The job folder automatically checks for the latest drawing revision, missing measurement sheets, and weather-critical exterior work. The connections named here are built and tested with test data; verified in real use so far is Odoo (Odoo 20, our own system). We qualify each further one with your account during onboarding before it runs in production.
Frequently asked questions: Trades and construction
What happens if the project folder contains two different revisions of a plan?
MITDesk selects the latest revision by date and revision number for the job folder and explicitly marks the older file as replaced.
What if the measurement sheet is still missing from the folder the evening before?
Page 1 of the job folder prominently states: "Measurements missing - clarify before leaving." There is never a silent gap.
Which plan fits a craft or construction business?
The Start plan (€149 / month) covers the daily job folder; with Team (€449 / month), job folders, material price monitoring, and post-calculation run in parallel.
Want to calculate effort and package fit for your team?
The 5-step solution configurator pre-selects this industry and task, calculates the time scenario, and recommends the fitting setup.
Other industries
